Interior remodeling

A wall does not have to be load-bearing for a remodel to need a permit. Start with what is changing, then check whether systems or the use of the space are involved.

A preliminary guide, not official approval. The department makes the final determination. Sources reviewed November 6, 2026.

Where is the property?

A mailing city or ZIP code alone does not establish the building authority. Choose County only for an unincorporated property under its authority.

Your answers stay in this page session. They are not saved or sent to McCann Contracting. Opening an official link leaves this guide.

Choose the property's area above to start. If you do not know, choose “I'm not sure” for official starting points.

Change project

What matters for this project.

Both local FAQs discuss house remodels and basement finishing as permit work. Structural, electrical, plumbing and mechanical changes are local triggers.

Residential finish work has a code exemption. Use the questions to check applicability and separate the listed finishes from accompanying alterations.

Changes that tend to need a permit

These are practical examples of the departments' published categories, not an exhaustive list issued by either department.

  • Add, remove or move a wall. Non-load-bearing does not mean automatically exempt.
  • Change beams, framing or the floor structure. Replacing a floor covering is a different scope.
  • Add or relocate circuits, wiring or outlets, such as adding a kitchen circuit.
  • Relocate plumbing or change piping, such as moving a kitchen sink.
  • Change heating, cooling or gas systems.
  • Finish a basement or convert space to living space, an apartment or an ADU. Ask about planning and occupancy review too.

Cedar City's FAQ says a permit is generally needed for structural, electrical, plumbing or mechanical changes and changes to walls or floors.

Iron County's FAQ refers to any structural, electrical, plumbing, or mechanical work. It also explicitly lists house remodels and basement finishing. Both offices need the actual scope.

Finish work has a code exemption

The adopted residential code lists painting, wallpaper, tile/carpet, cabinets, countertops and similar finish work as building-permit-exempt. That covers the finish work itself, not accompanying structural, wall-layout, plumbing, electrical or HVAC changes. The questions check a narrow residential scope and separate those alterations from the listed finishes.

ICC's March 2022 document reproduces the existing 2021 IRC R105.2, Building item 6: Painting, papering, tiling, carpeting, cabinets, counter tops and similar finish work. It is evidence of the residential-code text, not a separate Cedar City directive or a current standalone codebook.

The checker identifies the code-listed exemption when all the work is limited to those finishes in an existing one- or two-family home of no more than three stories, the residential code applies without a known conflict or uncertainty, and there are no structural, wall-layout, system, use, egress or fire-rated-assembly changes. A kitchen or bathroom project with other work is not cleared as a whole.

Mixed or uncertain scope and minor like-for-like repairs get an exact-scope check. No blanket exemption for sink disconnect/reconnect, roofing or window replacement is established here. Other applicable rules and approvals can still affect qualifying finish work.

Have these details ready

  • Which room and surfaces are changing, and what will stay.
  • Whether walls, framing or floor structure will change.
  • Which wiring, outlets, pipes, equipment or gas work is included.
  • Whether the space's use is changing, including a basement, apartment or ADU.